| Ensuite2 | Kitchen 1 |
| Deck Before | Deck After |
| Schnieder Railing Before Reno | Schnieder Railing After Reno |
| Gym Area Before | Gym Area After |
| Fence Build Before | Fence Build After |
| Door Before | Door After |
| Basement Development Before | Basement Development After |
| Wheelchair Ramp Before | Wheelchair Ramp After |
| Deck Project Before | Deck Project After |
| Smallwood Sink and Toilet Install | Smallwood Sink And Toilet After |
| Wheelchair Accessable Shower Before | Wheelchair Accessable Shower After |
| Patio Door Before | French Doors After |
| Cactus Valley Trailer #1 | Before Hot Tub and Stamped Concrete Patio |
| Before Fence | After Fence |
| After Hot Tub and Stamped Concrete Patio | Patio3 |
| Basement Before | Basement Before 2 |
| Shower Before | Shower before 2 |
| Shower After | Bathroom After |
| Basement Drywall Ready | Drywalled and Taped |
| Drywalled 2 | Basement Finished |
| Drywalling Basement | Finished Look |
| Hallway Pre Drywalled | Hallway Finished |
| Closet Framed | Closet Finished |
| Orlan AndJoyces Wall Before | IMG 1535 |
| Wall Prep | IMG 1538 |
| Orlan Wall After | Patio1 |
| Patio2 |